- Replacing the divider wall between the freezer and the fridge
- Replacing the water heather
- Installing digital tv-antenna
- Installing a wifi booster (components were bought from Island Time PC)
- Flushing the engine cooling system and fill with new coolant
- Removing the installed generator
- Installing the new Raymarine Ray70 AIS vhf radio
- Replacing the blocks at the mast base
So we changed plans and started the holidays with a day at the beach. It could have been worse ;-) The day at the beach was just fantastic!
If you are interested in the details of the several projects, go have a look, by clicking here.
After the two weeks, we almost completed all the scheduled work. Only two things could not be finished. The installation of the new radio will need wait until next time. And the generator is disconnected, all bolts are loose, but the unit is still in the boat. The boat will need to be moved, to gain access with a fork lift truck, to lift the unit up and pull it out.